Annual Report 2017

The power plants in Kristiinankaupunki and Tahkoluoto, Pori not part of the peak load reserve capacity

Pohjolan Voima and Metsähallitus filed for a permit to build a fishway at Raasakka

Laanilan Voima invests in energy efficiency and reliability

Automation system renovation at Isohaara is complete

Rauman Biovoima invested in a further reduction of emissions

We continued the development of our responsible operating methods in our value chain

Old riverbed of the Iijoki river in Raasakka is developed through local cooperation

An open day at the Jumisko power plant launched

Demands of the ELY Centre jeopardise collaboration required for the restoration of migratory fish

OL3 EPR project reaches hot functional test stage

Work practice reform increases flexibility and improves wellbeing

Pohjolan Voima's highlights in 2017

Download Annual Report 2017

Download center

Financial statements 2017

Read more

Investments

Read more

Responsibilty

Read more

Production year 2017

In 2017, Pohjolan Voima’s electricity production was 10.9 TWh. Our share of all electricity produced in Finland was approximately 17%. Heat production totalled 3.2 TWh.

Read more

106

Number of personnel

17%

Share of electricity production in Finland

2653 MW

Production capacity

10.9 TWh

Elecricity generation in 2017