Go to content
  • fi
  • en
    • Contacts
    Pohjolan Voima
    • Home
    • Decisive Power
      • Carbon neutrality
      • Digitality
      • Balancing power
      • Top expert in asset management
    • Sustainability
      • Sustainability programme
      • Sustainable development goals
      • Management of sustainability
      • Climate work
      • Biodiversity
      • Emissions
      • Water environment
      • Energy efficiency
      • Circular economy
      • Cooperation
      • Inspiring workplace
    • Energy production
      • Production in 2024
      • Power plants
      • Hydropower
      • Thermal power
      • Nuclear power
      • Asset management
    • About us
      • Strategy
      • Organisation
      • Responsibility principles
      • Our story
      • About our personnel
    • Investors
      • Financing
      • Key figures
      • Financial publications
      • Financial calendar
      • Investor contacts
    • Newsroom

    Newsroom

    • Main page
    • /
    • Newsroom
    • /
    26.6.2025 News Power plant news Press releases

    Completion of the overhaul of the first turbine at the Melo hydropower plant

    The renovation of the turbines at the Melo Hydropower Plant, located in the Nokianvirta River in the Kokemäenjoki watershed, is progressing. The renovation project was initiated ahead of schedule, and the first of the turbines to b…

    Ultracapacitor in Kierikki
    12.6.2025 News Power plant news Press releases

    Ultracapacitor completed in Kierikki – the new energy storage is tested on the Iijoki river as part of the electricity market

    The construction project for the energy storage at PVO-Vesivoima’s Kierikki power plant has been completed. The company’s first, in total a three-megawatt ultracapacitor has been installed and commissioned. The project, located in t…

    7.5.2025 News Press releases

    Environmental Impact Assessment Programme for Pohjolan Voima’s Pumped Storage Hydropower Project in Askanaapa Now Available – Puhti Office Also Opens in Kemijärvi

    The Environmental Impact Assessment (EIA) programme for PVO-Vesivoima Oy’s Puhti pumped storage hydropower (PSH) project is now available. The EIA programme has been submitted to the Lapland ELY Centre and is open for public review…

    2.4.2025 Investor news

    Japan Credit Rating Agency affirmed A+ long-term issuer rating on Pohjolan Voima Oyj; outlook stable

    Japan Credit Rating Agency (JCR) has on 2 April 2025 affirmed its previous long-term credit rating “A+”, stable outlook for Pohjolan Voima Oyj JCR’s report on 2 April 2025 Further information: Kaisa Ahtiainen, Group Treasurer,…

    Porin Prosessivoiman biovoimalaitos
    31.3.2025 News Power plant news Press releases

    Porin Prosessivoima invests in electric boiler​

    Pohjolan Voima’s subsidiary, Porin Prosessivoima, has made an investment decision for a 60-megawatt electric steam boiler. The boiler will be integrated into Porin Prosessivoima’s existing power plant complex. It ensures and enhance…

    Pohjolan Voiman logo
    25.3.2025 Stock exchange releases

    POHJOLAN VOIMA OYJ STOCK EXCHANGE RELEASE 25 MARCH 2025

    25.3.2025 14:23:37 EET | Pohjolan Voima Oyj | Decisions of general meeting POHJOLAN VOIMA OYJ STOCK EXCHANGE RELEASE 25 MARCH 2025   Resolutions of the Annual General Meeting of Pohjolan Voima Oyj Pohjolan Voima Oyj’s Annual Gene…

    19.3.2025 News

    Pohjolan Voima is one of Finland’s Best Workplaces 2025

    Pohjolan Voima has ranked second on the list of Finland’s Best Workplaces 2025 for small companies. Based on the results of the employee survey, Pohjolan Voima has received the Great Place To Work® certification in recognition of i…

    Pohjolan Voiman logo
    17.3.2025 Stock exchange releases

    POHJOLAN VOIMA OYJ STOCK EXCHANGE RELEASE 17 MARCH 2025

    17.3.2025 14:35:09 EET | Pohjolan Voima Oyj | Annual Financial Report POHJOLAN VOIMA OYJ STOCK EXCHANGE RELEASE 17 MARCH 2025   Pohjolan Voima Annual Report 2024 published Pohjolan Voima’s Annual Report 2024 has been publishe…

    5.3.2025 Investor news News

    To creditors of Pohjolan Voima Oyj: Announcement on the public notice

    Pohjolan Voima Oyj’s Extraordinary General Meeting held on 18 November 2024 unanimously decided to reduce the company’s share capital by EUR 1,982,534.30. In accordance with the Limited Liability Companies Act section 4 of Chapt…

    Pohjolan Voiman logo
    26.2.2025 Stock exchange releases

    Pohjolan Voima Oyj’s Financial Statements Release 2024

    26.2.2025 12:54:07 EET | Pohjolan Voima Oyj | Financial Statement Release POHJOLAN VOIMA OYJ STOCK EXCHANGE RELEASE 26 FEBRUARY 2025   Pohjolan Voima Oyj’s Financial Statements Release 2024   Pohjolan Voima’s electricity s…

    • Previous
    • 1
    • 2
    • 3
    • …
    • 20
    • Next

    Contents

    • All

    • Brochures

    • Financial publications

    • Investor news

    • News

    • Power plant news

    • Press releases

    • Stock exchange releases

    Themes

    • Corporate culture

    • Hydropower

    • Investors

    • Nuclear power

    • Pumped storage hydropower

    • Sustainability

    • Thermal power

    Contact information

    Pohjolan Voima Oyj
    Mikonkatu 7 A5
    P.O. Box 40
    FI-00101 Helsinki
    Tel. +358 (0)10 478 5000

    Contact information

    Links

    Newsroom

    About us

    Responsibility

    Power plants

    For media

    Feedback

    Annual Report 2024

    Copyright © 2025 Pohjolan Voima Privacy Statement Legal Notice Show my cookie settings