Go to content
  • fi
  • en
    • Contacts
    Pohjolan Voima
    • Home
    • Decisive Power
      • Carbon neutrality
      • Digitality
      • Balancing power
      • Top expert in asset management
    • Sustainability
      • Sustainability programme
      • Sustainable development goals
      • Management of sustainability
      • Climate work
      • Biodiversity
      • Emissions
      • Water environment
      • Energy efficiency
      • Circular economy
      • Cooperation
      • Inspiring workplace
    • Energy production
      • Production in 2024
      • Power plants
      • Hydropower
      • Thermal power
      • Nuclear power
      • Asset management
    • About us
      • Strategy
      • Organisation
      • Responsibility principles
      • Our story
      • About our personnel
    • Investors
      • Financing
      • Key figures
      • Financial publications
      • Financial calendar
      • Investor contacts
    • Newsroom

    News

    • Main page
    • /
    • Newsroom
    • /
    • News
    • /
    • Page 10
    • /
    23.3.2021 News Power plant news

    Overhaul of the Jumisko hydropower plant has begun

    The overhaul of PVO-Vesivoima’s Jumisko hydropower plant in Kemijärvi has begun. The overhaul will improve the power plant’s capacity to produce regulating energy that will provide an important balance to the national power sup…

    23.2.2021 News Power plant news

    PVO-Vesivoima’s new central control system enhances the operation of hydropower plants

    PVO-Vesivoima’s hydropower plants on the Iijoki, Kemijoki and Kokemäenjoki rivers will introduce a new central control system in March. The selected system is Valmet DNA, and the supplier is Valmet.
    The system will provide PVO-V…

    20.1.2021 News Power plant news Press releases

    PVO-Vesivoima and Caverion continue their long-term partnership in the operation and maintenance of hydropower plants

    Pohjolan Voima’s subsidiary PVO-Vesivoima Oy and Caverion have signed a follow-up agreement concerning operation and maintenance for the Kokemäenjoki, Iijoki and Kemijoki hydropower plants in Finland. The agreement will ensur…

    18.12.2020 News

    Season’s greetings

    We have donated the money reserved for Christmas greetings to charity. We support the Good Holiday Spirit campaign 2020 The Good Holiday Spirit campaign is a joint fundraising initiative of the Mannerheim League for Child Welfare an…

    16.12.2020 News Power plant news Press releases

    New caisson technique replaces diving when repairing hydropower plants

    The caisson innovation designed by PVO-Vesivoima’s specialists saves effort and money when repairing hydropower plants. The innovators received Pohjolan Voima’s initiative award for their idea. Performing concrete repair work wh…

    14.12.2020 News Power plant news Press releases

    Permit for Raasakka fishway – good news for migratory fish

    The Regional State Administrative Agency for Northern Finland decided to grant a water management permit for the Raasakka fishway in Iijoki. The decision is significant for the work to revive stocks of migratory fish in the Iijoki r…

    14.12.2020 News

    Pohjolan Voima is one of the Most Inspiring Employers in Finland in 2020

    Pohjolan Voima reached excellent results in its personnel satisfaction survey for 2020. Pohjolan Voima is one the most inspiring employers in Finland in 2020. This recognition can only be achieved by organisations reaching optimal r…

    Fig. 1: PVO-Vesivoima Oy. PVO-Vesivoima Oy and OMP-Konepaja Oy signed the contract agreement for the Haapakoski downstream migration route on 6 November 2020. In the front from left: Vesa Korkiakoski, the managing director of OMP-Konepaja Oy, and Jani Pulli, the managing director of PVO-Vesivoima Oy. At the back from left: Jani Ahola, project manager from OMP-Konepaja Oy, and Jyrki Salo, project manager from PVO-Vesivoima Oy.
    9.11.2020 News Power plant news Press releases

    Finland’s first downstream migration route for smolt built at Haapakoski rapids in Iijoki river

    A construction project worth more than EUR 1.5 million will be started in November at Haapakoski rapids in the Iijoki river to secure the downstream migration of salmonids.    “The construction of a downstream migration…

    Kymin Voiman voimalaitos
    2.11.2020 News Power plant news Press releases

    Kymin Voima’s biopower plant is ready for winter

    Kymin Voima’s biopower plant has made preparations for the winter. Fuel levels are good for the winter, the plant has been serviced thoroughly and the forest residuals crusher, which was damaged in the small fire at the beginning…

    Pohjolan Voima´s Laanilan Voima power plant in Oulu, Northern Finland
    19.10.2020 News Power plant news Press releases

    Laanilan Voima Oy doubles the use of wood-based fuels as a source of energy

    The investment amounting to nearly EUR 4,000,000 in the Laanilan Voima power plant will increase the share of wood-based fuels to 50% of all the fuels used in the power plant and make it possible to replace peat with by-products fro…

    • Previous
    • 1
    • …
    • 8
    • 9
    • 10
    • 11
    • Next

    Contents

    • All

    • Brochures

    • Financial publications

    • Investor news

    • News

    • Power plant news

    • Press releases

    • Stock exchange releases

    Themes

    • Corporate culture

    • Hydropower

    • Investors

    • Nuclear power

    • Pumped storage hydropower

    • Sustainability

    • Thermal power

    Contact information

    Pohjolan Voima Oyj
    Mikonkatu 7 A5
    P.O. Box 40
    FI-00101 Helsinki
    Tel. +358 (0)10 478 5000

    Contact information

    Links

    Newsroom

    About us

    Responsibility

    Power plants

    For media

    Feedback

    Annual Report 2024

    Copyright © 2025 Pohjolan Voima Privacy Statement Legal Notice Show my cookie settings