Go to content
  • fi
  • en
    • Contacts
    Pohjolan Voima
    • Home
    • Decisive Power
      • Carbon neutrality
      • Digitality
      • Balancing power
      • Top expert in asset management
    • Sustainability
      • Sustainability programme
      • Sustainable development goals
      • Management of sustainability
      • Climate work
      • Biodiversity
      • Emissions
      • Water environment
      • Energy efficiency
      • Circular economy
      • Cooperation
      • Inspiring workplace
    • Energy production
      • Production in 2024
      • Power plants
      • Hydropower
      • Thermal power
      • Nuclear power
      • Asset management
    • About us
      • Strategy
      • Organisation
      • Responsibility principles
      • Our story
      • About our personnel
    • Investors
      • Financing
      • Key figures
      • Financial publications
      • Financial calendar
      • Investor contacts
    • Newsroom

    Hydropower

    • Main page
    • /
    • Newsroom
    • /
    • Aiheet
    • /
    • Hydropower
    • /
    • Page 5
    • /
    23.2.2021 News Power plant news

    PVO-Vesivoima’s new central control system enhances the operation of hydropower plants

    PVO-Vesivoima’s hydropower plants on the Iijoki, Kemijoki and Kokemäenjoki rivers will introduce a new central control system in March. The selected system is Valmet DNA, and the supplier is Valmet.
    The system will provide PVO-V…

    20.1.2021 News Power plant news Press releases

    PVO-Vesivoima and Caverion continue their long-term partnership in the operation and maintenance of hydropower plants

    Pohjolan Voima’s subsidiary PVO-Vesivoima Oy and Caverion have signed a follow-up agreement concerning operation and maintenance for the Kokemäenjoki, Iijoki and Kemijoki hydropower plants in Finland. The agreement will ensur…

    16.12.2020 News Power plant news Press releases

    New caisson technique replaces diving when repairing hydropower plants

    The caisson innovation designed by PVO-Vesivoima’s specialists saves effort and money when repairing hydropower plants. The innovators received Pohjolan Voima’s initiative award for their idea. Performing concrete repair work wh…

    14.12.2020 News Power plant news Press releases

    Permit for Raasakka fishway – good news for migratory fish

    The Regional State Administrative Agency for Northern Finland decided to grant a water management permit for the Raasakka fishway in Iijoki. The decision is significant for the work to revive stocks of migratory fish in the Iijoki r…

    Fig. 1: PVO-Vesivoima Oy. PVO-Vesivoima Oy and OMP-Konepaja Oy signed the contract agreement for the Haapakoski downstream migration route on 6 November 2020. In the front from left: Vesa Korkiakoski, the managing director of OMP-Konepaja Oy, and Jani Pulli, the managing director of PVO-Vesivoima Oy. At the back from left: Jani Ahola, project manager from OMP-Konepaja Oy, and Jyrki Salo, project manager from PVO-Vesivoima Oy.
    9.11.2020 News Power plant news Press releases

    Finland’s first downstream migration route for smolt built at Haapakoski rapids in Iijoki river

    A construction project worth more than EUR 1.5 million will be started in November at Haapakoski rapids in the Iijoki river to secure the downstream migration of salmonids.    “The construction of a downstream migration…

    Jani Pulli, PVO-Vesivoiman toimitusjohtaja ja Pohjolan Voiman energiapäällikkö
    1.9.2020 News Press releases

    Jani Pulli returns home to Oulu to start work as managing director of PVO-Vesivoima Oy 

    Jani Pulli, a longstanding hydropower expert and engineer, will be leading PVO-Vesivoima Oy as of 1 September. Pulli, who started work at the Pohjolan Voima Group as head of operations more than twenty years ago, is a well-known&nbs…

    Jani Pulli, PVO-Vesivoiman toimitusjohtaja ja Pohjolan Voiman energiapäällikkö
    7.4.2020 News Press releases

    Jani Pulli appointed as Managing Director of PVO-Vesivoima Oy as of 1 September 2020

    Jani Pulli has been appointed as the Managing Director of PVO-Vesivoima Oy. Mr Pulli will take over this position from Pertti Pietinen, who will retire as planned. Mr Pulli will start in his new position on 1 September 2020. He will…

    25.2.2020 News Press releases

    Best results achieved by cooperation in the restoration of migratory fish

    A pioneering collaboration is currently underway to help the Iijoki river’s migratory fish. PVO-Vesivoima has made a commitment to the collaboration, aimed at promoting the restoration of the migratory fish’s natural cycle. T…

    • Previous
    • 1
    • …
    • 3
    • 4
    • 5
    • Next

    Contents

    • All

    • Brochures

    • Financial publications

    • Investor news

    • News

    • Power plant news

    • Press releases

    • Stock exchange releases

    Themes

    • Corporate culture

    • Hydropower

    • Investors

    • Nuclear power

    • Pumped storage hydropower

    • Sustainability

    • Thermal power

    Contact information

    Pohjolan Voima Oyj
    Mikonkatu 7 A5
    P.O. Box 40
    FI-00101 Helsinki
    Tel. +358 (0)10 478 5000

    Contact information

    Links

    Newsroom

    About us

    Responsibility

    Power plants

    For media

    Feedback

    Annual Report 2024

    Copyright © 2025 Pohjolan Voima Privacy Statement Legal Notice Show my cookie settings